Our project at BP filling station showcases the future of sustainable energy. With our state-of-the-art solar installation, BP is now powered by free renewable energy. This installation not only ensures productivity and business up-time but also ensures reliable, cost-effective power for years to come.

BP Filling Station

Client

BP Filling Station

Sector

Petroleum

System

Hybrid Solar

Solar Capacity

74KW

 

Inverter Capacity

75kW

 

Battery Capacity

96kWh

 

Est. Payback Period

28 Months

 

Est. 25 Year Net ROI

R9.9 Million

 

System Details

Property Type: Commercial | System Type: Hybrid Solar System | Inverters: 3 x 25kW 3-phase Sigenergy Hybrid Inverters (Total Inverter Capacity: 75kW) | Batteries: 12 x 8kWh Sigenergy Batteries (Total Battery Energy Storage Capacity: 96kWh) | Solar Panels: 169 x Longi 435W Solar Panels (Total Solar Capacity: 73.515kWp) | Gateway: 120kW 3-phase Sigenergy Gateway used to AC couple all system components | Mounting Structure: Custom-designed by KD Solar, a company specializing in solar panel mounting, for easy installation on top of a canopy | Security: ClearVu fence installed around the equipment for extra security

Challenges Faced

  • High Electricity Tariff: The property was subject to high electricity costs, significantly impacting operational expenses.
  • Long Duration Power Outages: The property experienced frequent and prolonged power outages, sometimes lasting for days, which disrupted business operations.

 

Solutions Implemented

  • Hybrid Solar System: Royal Power installed a hybrid solar PV system to generate electricity during daylight hours, significantly reducing reliance on the grid. The system is designed to seamlessly switch between solar, battery, and generator power as needed.
  • Battery Storage: The system, installed by Royal Power, includes 12 x 8kWh Sigenergy batteries, providing a total energy storage capacity of 96kWh. This allows the property to store excess solar energy generated during the day to power the property at night.
  • Diesel Generator Integration: The existing 80kW diesel generator was integrated with the solar and battery systems by Royal Power. It is configured to automatically start when battery levels are low, and the grid is unavailable, ensuring continuous power supply.
  • AC Coupling: The 120kW 3-phase Sigenergy Gateway was used to AC couple all components of the system, ensuring efficient and reliable integration of the solar panels, inverters, batteries, and generator.
  • Outdoor Installation & Security: The Sigenergy equipment, including inverters and batteries, is IP66 rated, allowing for outdoor installation with protection against dust and water. For additional security, a ClearVu fence was installed around the equipment.
  • Health & Safety Protocols: Due to the high-risk nature of the site, given the flammable nature of petroleum, stringent health and safety protocols were followed during the construction and installation of the system. These protocols ensured the safety of all workers and the integrity of the site throughout the build-out process.

Integration and Control

  • Seamless Integration: The hybrid inverters and battery system, installed by Royal Power, were integrated to work in harmony with the solar panels and diesel generator, providing a reliable and continuous power supply. The total inverter capacity of the system is 75kW.
  • Monitoring and Control System: The system’s monitoring and control are managed through the mysiGEN app from Sigenergy, the first system on the market to integrate AI into energy management for SSEG (Small-Scale Embedded Generation) plants. This advanced app ensures optimal performance, enabling real-time monitoring and intelligent decision-making to maximize efficiency and savings.

 

Results

  • Energy Savings: The system now provides the filling station with 50% of its electricity needs, reducing the energy bill and diesel consumption at the site.
  • Uninterrupted Operations: The combination of solar power, battery storage, and generator backup ensures that the filling station can operate continuously, even during extended power outages.
  • Financial Savings: The reduction in grid electricity usage and optimized generator operation result in substantial savings on operational costs.